Frequently Asked Questions • RCRA Subtitle C Environmental Jurisprudence
What are the three hazardous waste generator categories under 40 CFR § 262.13?
Under 40 CFR § 262.13, a facility's generator category is determined based on the amount of hazardous waste generated in a calendar month: (1) Very Small Quantity Generator (VSQG): generates <= 100 kg (approx 220 lbs or half a 55-gallon drum) of non-acute hazardous waste and <= 1 kg of acute hazardous waste per month; (2) Small Quantity Generator (SQG): generates > 100 kg and < 1,000 kg (approx 220 to 2,200 lbs) of non-acute waste and <= 1 kg acute waste; and (3) Large Quantity Generator (LQG): generates >= 1,000 kg (approx 2,200 lbs or 5+ drums) of non-acute waste OR > 1 kg of acute hazardous waste per month.
What are the on-site accumulation time limits for SQGs and LQGs without a storage permit?
Under 40 CFR § 262.16 and § 262.17, generators may accumulate hazardous waste on site in Central Accumulation Areas (CAAs) without a RCRA Part B storage permit, provided they strictly observe statutory time limits: (1) LQGs: strictly 90 days maximum; (2) SQGs: 180 days maximum (or 270 days if the designated TSDF disposal facility is over 200 miles away), provided on-site accumulated waste never exceeds 6,000 kg. Storing waste one day beyond these statutory limits converts the facility into an unpermitted storage facility subject to civil penalties exceeding $87,855 per day.
What are the rules for Satellite Accumulation Areas (SAAs) under 40 CFR § 262.15?
A generator may accumulate up to 55 gallons of non-acute hazardous waste or 1 quart of acute hazardous waste in containers at or near any point of generation that is under the direct control of the operator of the process. Containers must be marked 'Hazardous Waste', kept closed except when adding waste, and in good condition. When the 55-gallon or 1-quart limit is reached, the generator has exactly three consecutive calendar days to mark the container with the date and move it to a central accumulation area (CAA) or offsite TSDF.
What are the mandatory emergency contingency requirements for an LQG?
Under 40 CFR Part 262 Subpart M (§§ 262.250-262.265), an LQG must maintain a full written Contingency Plan detailing emergency response procedures, designate primary and alternate Emergency Coordinators available 24/7, submit an Executive Quick Reference Guide to local police, fire, and hospitals, and maintain documented annual hazardous waste personnel training records under Subpart L.
What is the RCRA Biennial Report requirement for Large Quantity Generators?
Under 40 CFR § 262.41, an LQG must submit a comprehensive Biennial Report (EPA Form 8700-13A/B) to the EPA Regional Administrator by March 1 of each even-numbered year, covering all hazardous waste generated, treated, stored, or shipped offsite during the preceding odd-numbered calendar year.
×
Embed RCRA Generator Auditor
Copy the code snippet below to embed this calculator on your environmental or industrial safety website: