EPA Environmental Regulations (40 CFR Part 112)

EPA SPCC Spill Prevention Plan Compliance Auditor

Audit Spill Prevention, Control, and Countermeasure (SPCC) thresholds (> 1,320 gal), classify Tier I / Tier II Qualified Facilities, and verify secondary containment volume standards.

1. Oil Storage Inventory & Thresholds

Only count containers with capacity ≥ 55 U.S. gallons.

2. Operational & Plan Maintenance

3. Regulatory Status & Engineering Mandate

SPCC COMPLIANT: TIER I SELF-CERTIFICATION
SPCC Applicability
Covered (>1,320g)
Facility Tier
Tier I Qualified
PE Certification
Not Required
Containment Status
SUFFICIENT
Regulatory Criterion Status / Metric 40 CFR Citation

Secondary Containment & Review Summary

Required Secondary Containment (110% of Largest Tank): 2,750 Gallons
Actual Secondary Containment Margin: +250 Gallons (Surplus)
Mandatory 5-Year Review Cycle: Up to Date (40 CFR § 112.5)
Max Daily EPA Civil Penalty Exposure: $0 (Compliant)

Frequently Asked Questions: EPA SPCC Rule (40 CFR Part 112)

When does a facility become subject to EPA SPCC regulations under 40 CFR Part 112?

Under 40 CFR § 112.1, a non-transportation-related facility is subject to SPCC rule requirements if: (1) it drills, produces, gathers, stores, processes, refines, transfers, distributes, uses, or consumes oil; (2) it has an aggregate aboveground oil storage capacity greater than 1,320 U.S. gallons (counting only containers of 55 gallons or greater) OR completely buried storage exceeding 42,000 gallons; and (3) there is a reasonable expectation of an oil discharge into navigable waters or adjoining shorelines.

What is the difference between Tier I, Tier II, and PE-certified SPCC facilities?

Under 40 CFR § 112.3(g), a 'Qualified Facility' has an aggregate aboveground storage capacity of 10,000 gallons or less with no reportable oil discharges (no single discharge > 1,000 gallons or two > 42 gallons in the past 3 years). Tier I facilities have no single container exceeding 5,000 gallons and can use an EPA self-certification template without a Professional Engineer (PE). Tier II facilities have an individual container exceeding 5,000 gallons and can prepare a self-certified SPCC plan. Facilities exceeding 10,000 gallons must have an SPCC plan reviewed and certified by a licensed Professional Engineer.

What are the secondary containment requirements under 40 CFR § 112.7(c)?

Facilities must provide appropriate containment (such as dikes, berms, retention ponds, or double-walled tanks) designed to hold the volume of the largest single tank plus sufficient freeboard to contain a 25-year, 24-hour storm rainfall event (standard engineering practice generally specifies 110% of the largest tank capacity).

What are the penalties for failing to prepare and maintain an SPCC plan?

Under Section 311 of the Clean Water Act (33 U.S.C. § 1321) and EPA civil penalty inflation adjustments, failure to maintain or comply with an SPCC plan can result in administrative civil penalties of up to $25,000 to over $45,000 per day per violation, in addition to liability for cleanup costs and natural resource damages.