Clean Water Act § 404 Wetlands Permit & WOTUS Auditor

Determine dredge and fill permit requirements under CWA Section 404, audit jurisdictional Waters of the United States (WOTUS) under the Supreme Court Sackett continuous surface connection test, and check USACE Nationwide Permit limits.

Project Wetland Impact Parameters

General Nationwide Permit (NWP) ceiling is strictly 0.50 acre.

Statutory Permitting Verdict

US Army Corps of Engineers Permit Classification
NATIONWIDE PERMIT (NWP) ELIGIBLE

Wetland impact is under 0.50 acre and qualifies under USACE general permit.

Jurisdictional
Sackett WOTUS Status
NWP 29
Permit Instrument
45-Day PCN
USACE Review Clock

Statutory Threshold Audit

Regulatory Prerequisite Applicable Standard Status / Findings
Calculating permitting thresholds...
Environmental Reference: 33 U.S.C. § 1344; 40 CFR Part 230; Sackett v. EPA, 143 S. Ct. 1322 (2023). Discharging fill into jurisdictional wetlands without a USACE permit carries civil penalties of up to $64,618 per day per violation under CWA § 309(d).
🏠 Home Hub

Frequently Asked Statutory Questions (FAQ)

What activities require a Clean Water Act Section 404 permit? ▼
Under Section 404 of the Clean Water Act (33 U.S.C. § 1344), a permit issued by the U.S. Army Corps of Engineers (USACE) is required before dredged or fill material may be discharged into Waters of the United States (WOTUS), including wetlands, streams, rivers, and lakes during construction, development, or utility installation.
How did the Supreme Court's Sackett v. EPA decision change WOTUS wetland jurisdiction? ▼
In Sackett v. EPA (2023), the U.S. Supreme Court eliminated the broad 'significant nexus' test. To be jurisdictional WOTUS, a wetland must now be 'adjacent' to a relatively permanent body of water connected to traditional navigable waters, meaning it possesses a continuous surface connection with that water, making it difficult to determine where the water ends and the wetland begins.
What is the disturbance threshold between a Nationwide Permit (NWP) and an Individual Permit? ▼
Standard general Nationwide Permits (such as NWP 29 for residential development and NWP 39 for commercial development) are limited to impacts not exceeding 0.50 acre of non-tidal waters of the United States. Projects exceeding 0.50 acre of wetland impact (or projects causing significant environmental degradation) require a comprehensive Individual Permit subject to public notice and NEPA review.
What is the EPA 404(b)(1) Guidelines mitigation sequence? ▼
Under the EPA 404(b)(1) Guidelines (40 CFR Part 230), the permit applicant must demonstrate a strict three-step sequencing: (1) Avoidance (demonstrating no practicable non-wetland alternative exists); (2) Minimization (minimizing unavoidable impacts through project redesign); and (3) Compensatory Mitigation (replacing lost wetland ecological functions via wetland mitigation bank credits or in-lieu fee programs).