Environmental Law & Clean Water Act

Clean Water Act § 404 Wetlands Jurisdiction Auditor

Evaluate federal wetland jurisdiction under Sackett v. EPA, continuous surface connection tests, relatively permanent waters, and USACE Section 404 permit obligations.

1. Hydrological & Spatial Characteristics

2. Proposed Activity & Discharge Scope

3. Jurisdictional Determination & Permit Path

JURISDICTIONAL WOTUS: USACE PERMIT MANDATORY
Sackett Test Status
JURISDICTIONAL
Permit Instrument
NWP 39 / NWP 14
Est. Mitigation Cost
$42,000
Max Daily Penalty
$64,618 / day
Legal Criterion Evaluation Statutory Basis

Permit Track & Agency Consultation Summary

Federal Regulatory Agency: U.S. Army Corps of Engineers (USACE)
State Wetland Oversight: Section 401 Water Quality Cert. Required
Nationwide Permit (NWP) Threshold: ≤ 0.50 Acre Impact
Individual Permit (IP) Public Notice: Not Required (< 0.50 Acres)

Frequently Asked Questions: Clean Water Act § 404 Wetland Jurisdiction

How did the Supreme Court decision in Sackett v. EPA change CWA § 404 wetland jurisdiction?

In Sackett v. EPA, 598 U.S. 651 (2023), the Supreme Court invalidated the 'significant nexus' standard. Under the new statutory test, adjacent wetlands are only jurisdictional 'Waters of the United States' (WOTUS) under CWA § 404 if they have a continuous surface connection to a relatively permanent body of water that is connected to traditional navigable waters, making them indistinguishable from those waters.

What constitutes a 'Relatively Permanent Water' (RPW) under current EPA/USACE guidance?

Under 40 CFR § 120.2 and 33 CFR § 328.3 (as amended conforming to Sackett), an RPW is a body of water that is standing or continuously flowing, such as perennial or seasonal rivers, streams, and lakes. Features that flow only ephemerally in response to precipitation events are excluded from federal jurisdiction.

What permits are required if a project discharges dredged or fill material into jurisdictional wetlands?

Discharging dredged or fill material into jurisdictional WOTUS requires a permit from the U.S. Army Corps of Engineers (USACE) under CWA Section 404. Activities with minimal individual and cumulative impacts may qualify for a general permit (such as a Nationwide Permit - NWP), whereas larger projects require a detailed Individual Permit (IP) with public notice and an alternatives analysis.

What are the penalties for unpermitted discharges into Clean Water Act wetlands?

Under 33 U.S.C. § 1319(d), civil administrative and judicial penalties for unpermitted fill into jurisdictional waters can exceed $64,000 per day per violation under modern inflation adjustments, accompanied by mandatory restoration orders, mitigation banking costs, and potential criminal penalties for knowing violations under § 1319(c).