EPA Clean Air Act Section 112(r) RMP Threshold Auditor

Evaluate chemical inventory against EPA Risk Management Plan (RMP) Threshold Quantities (40 CFR Part 68), classify Program 1, 2, or 3 mandates, and audit 5-year compliance cycles.

1. Regulated Substance & Inventory

Process Safety & Offsite Receptor Criteria

2. RMP Program Tier & Compliance Obligations

MANDATORY: EPA RMP Program 3 Covered Process
Quantity exceeds statutory TQ. Subject to full PHA, MOC, and 5-year RMP filings.
RMP Statutory Status
COVERED PROCESS
Assigned Program Tier
Program 3 (PSM Level)
Statutory TQ
10,000 lbs
Quantity vs Threshold
+4,500 lbs (145%)

Mandatory Program 3 Elements (40 CFR Part 68)

  • • Process Hazard Analysis (PHA) every 5 years with engineering revalidation.
  • • Written Standard Operating Procedures (SOPs) & annual certified safe work practices.
  • • Management of Change (MOC) and Pre-Startup Safety Reviews (PSSR).
  • • Compliance Audits every 3 years & 5-Year electronic submission to EPA CDX RMP*eSubmit.
Safer Technologies and Chemical Alternatives (STAA - 2024 Rule): Facilities in petroleum and chemical sectors must perform an evaluation of inherently safer technology (IST) during each PHA cycle.
Emergency Response Exercises (40 CFR § 68.96): Covered facilities must conduct annual notification drills, tabletop exercises every 3 years with local emergency planning committees (LEPCs), and field exercises at least every 10 years.

Frequently Asked Questions: EPA Clean Air Act Section 112(r)

What is the "General Duty Clause" under Clean Air Act Section 112(r)(1)?
Even if a facility holds chemicals below the specific RMP Threshold Quantities, the General Duty Clause (CAA § 112(r)(1)) applies to ANY stationary source producing, processing, handling, or storing extremely hazardous substances. Owners have a legal duty to identify hazards, design and maintain a safe facility, and minimize accidental release consequences.
How does EPA determine connected inventory in a single process?
Under 40 CFR § 68.3, a 'process' means any activity involving a regulated substance, including using, storing, manufacturing, handling, or moving substances in interconnected vessels or separate vessels that are co-located such that an accidental release from one could involve another. Interconnected piping aggregates all vessels into a single process.
What are the penalties for failing to submit a Risk Management Plan?
Under Clean Air Act Section 113(b), civil administrative penalties for failure to file an RMP, maintain mechanical integrity, or perform PHAs exceed $55,000 per day per violation, in addition to mandatory administrative compliance orders.
When must an RMP be updated and re-submitted to EPA?
An RMP must be updated and resubmitted via EPA CDX: (1) at least once every 5 years from initial submission; (2) within 6 months of an accidental release with offsite impacts; or (3) prior to introducing a new regulated substance above its threshold quantity.