Clean Water Act § 311 SPCC Oil Spill Prevention Auditor

Audit EPA Clean Water Act Section 311 Spill Prevention, Control, and Countermeasure (SPCC) compliance under 40 CFR Part 112. Calculate the 1,320-gallon aboveground storage threshold, determine Tier I / Tier II Qualified Facility self-certification eligibility vs mandatory Professional Engineer (PE) certification, and evaluate secondary containment sizing.

1. Oil Storage Inventory & Containers

Count only containers 55 gallons or larger (40 CFR § 112.1(d)(2))

2. Facility Site & Containment Design

Statutory Audit & Plan Tier Results

Tier I Qualified Facility (Self-Certified)
1,320-Gallon Aboveground Threshold: SUBJECT TO 40 CFR PART 112
EPA SPCC Facility Plan Tier: Tier I Qualified (Self-Certified Template)
Professional Engineer (PE) Seal Required? NO (Self-Certification Eligible)
Required Secondary Containment (110% Sizing): 4,400 Gallons
Secondary Containment Adequacy: SUFFICIENT (+400 Gal Safety Margin)
EPA Daily Civil Penalty Cap (2024+): $55,808 / day
Total Potential Civil Penalty Exposure: $1,674,240
Statutory Analysis: The facility aggregate capacity exceeds 1,320 gallons and poses a discharge risk to navigable waters. Because total storage is under 10,000 gallons, no individual tank exceeds 5,000 gallons, and the spill history is clean, the owner qualifies to self-certify using the EPA Tier I SPCC template without hiring a Professional Engineer.
Statutory Authority & Compliance References:

Clean Water Act Section 311, 33 U.S. Code § 1321; 40 CFR Part 112 (Oil Pollution Prevention); 40 CFR § 112.3(g) (Qualified facility criteria); 40 CFR § 112.7(c) (Secondary containment design standards); EPA annual civil penalty inflation adjustments under 40 CFR Part 19.

🏠 Home Hub

Frequently Asked Questions Regarding CWA § 311 SPCC Plans

What triggers EPA SPCC rule applicability under 40 CFR Part 112?

Under 40 CFR § 112.1, a facility is subject to SPCC regulations if: (1) it stores, uses, or consumes oil or petroleum products; (2) has an aggregate aboveground oil storage capacity exceeding 1,320 gallons (counting only containers of 55 gallons or greater), or completely buried storage capacity exceeding 42,000 gallons; and (3) could reasonably be expected to discharge oil into navigable waters or adjoining shorelines.

What is the difference between a Tier I Qualified Facility, Tier II, and a PE-Certified SPCC Plan?

Facilities with 10,000 gallons or less of aggregate aboveground capacity and a clean spill history are 'Qualified Facilities.' If no individual container exceeds 5,000 gallons, the owner can self-certify using the EPA Tier I template. If an individual container exceeds 5,000 gallons, the owner can self-certify a Tier II plan. Facilities with over 10,000 gallons MUST have their SPCC plan reviewed and certified by a licensed Professional Engineer (PE).

What are the secondary containment sizing requirements under the SPCC rule?

Under 40 CFR § 112.7(c) and § 112.8(c)(2), secondary containment systems (such as berms or dikes) must hold the entire capacity of the largest single container within the containment area, plus sufficient additional freeboard to hold precipitation from a 25-year, 24-hour storm event (commonly 110% of the largest tank volume).