Federal Environmental Protection • 33 U.S.C. § 1342

Clean Water Act § 402 NPDES Stormwater Permit Auditor

Audit EPA Construction General Permit (CGP) coverage, 1-acre soil disturbance threshold, 40 CFR § 122.26 SWPPP mandates, 24-hr post-storm inspections, sediment basin rules, and $59,973/day civil penalties.

Site & Disturbance Profile

Statutory Threshold: >= 1.0 acre triggers mandatory NPDES CGP permit.

EPA NeT requires NOI at least 14 days prior to commencing earth-disturbing work.

BMPs & Sediment Basin Requirements

Erosion & sediment controls, stabilization timelines, and pollution prevention measures.

Provides 3,600 cubic feet of storage per acre drained under CGP Part 2.2.12.

Regulatory Audit & Environmental Mandates

NPDES CGP Permit Coverage: MANDATORY PERMIT REQUIRED
1-Acre Threshold Status: EXCEEDS 1.0 ACRE (3.5 Acres)
NOI 14-Day Waiting Period: COMPLIANT (16 >= 14 Days)
Mandatory Site Inspection Protocol: Every 7 Days OR 14 Days + 24-Hr Post-Rain
Sediment Basin Requirement: EXEMPT (< 10 Acres)
Statutory Civil Penalty Risk: $59,973+ / day

Statutory Jurisprudence & Environmental Precedents

1. What is the 'Common Plan of Development' rule under 40 CFR § 122.26?

If a parcel is less than 1 acre (e.g., a 0.3-acre commercial outparcel), it is still covered by the CGP if it is part of a larger common plan of development (such as a 15-acre retail center or residential subdivision) that will cumulatively disturb 1 or more acres. Individual builders in a subdivision must obtain permit coverage even for single small lots.

2. When does the CGP require Sediment Basins under Part 2.2.12?

For any common drainage location that serves an area with 10 or more acres disturbed at one time, the operator must design and maintain a sediment basin providing at least 3,600 cubic feet of storage per acre drained until final stabilization of the site is complete.

3. What triggers a post-rainfall inspection under the 14-day option?

Under CGP Part 4.2.2, if an operator selects the 14-day inspection schedule, an inspection must be conducted within 24 hours of the occurrence of a storm event of 0.25 inches or greater in a 24-hour period. Rainfall must be measured using an on-site rain gauge or verified local weather station data.

4. What constitutes 'Final Stabilization' under CGP Part 2.2.14?

Final stabilization requires: (1) All earth-disturbing activities are complete; (2) A uniform, perennial vegetative cover with a density of 70% of the natural background vegetative cover has been established on all unpaved areas; or (3) Equivalent permanent stabilization measures (riprap, gabions, geotextiles) have been implemented.

5. How does the EPA enforce Clean Water Act citizen suits under 33 U.S.C. § 1365?

Under Section 505 of the Clean Water Act, environmental organizations and citizens can file federal lawsuits against construction operators for discharging stormwater without an NPDES permit or violating SWPPP requirements. Citizens can recover injunctive relief, statutory penalties paid to the U.S. Treasury, and mandatory attorney's fees.