Federal Environmental Protection • 40 CFR Part 68

Clean Air Act § 112(r) Risk Management Plan (RMP) Auditor

Audit 40 CFR Part 68 chemical Threshold Quantities (TQ), Program 1, 2, and 3 tier applicability, Off-site Consequence Analysis (OCA), and EPA RMP*eSubmit compliance deadlines.

Chemical & Facility Profile

Includes interconnected vessels or co-located storage vessels.

Program Tier Audit Factors (§ 68.10)

Homes, schools, hospitals, commercial areas, or national parks within endpoint distance (disqualifies from Program 1).

Any accidental release in past 5 years resulting in offsite death, injury, evacuation, sheltering-in-place, or environmental damage.

Facility process is subject to OSHA Process Safety Management (triggers Program 3).

Pulp mills, petroleum refineries, or chemical manufacturing plants (triggers Program 3).

RMP Classification & Regulatory Mandates

RMP Program Classification: PROGRAM 3 (Full PSM Scope)
Threshold Quantity (TQ) Status: EXCEEDS TQ (15,000 > 10,000 lbs)
Off-site Consequence Analysis (OCA): MANDATORY (Worst-Case & Alternative)
Accident Prevention Program: Full 40 CFR Part 68 Subpart D (12 Elements)
Mandatory Resubmission Interval: 5 Years (or within 6 mos of release)
Statutory Civil Penalty Exposure: $67,544+ / day
EPA General Duty Clause Warning: Even if chemical inventory remains below the Threshold Quantity, Clean Air Act Section 112(r)(1) imposes a statutory General Duty to identify hazards, design and maintain a safe facility, and minimize accidental release consequences.

Statutory Jurisprudence & Practice Notes

1. What distinguishes Program 1, Program 2, and Program 3 tiers?

Program 1 imposes minimal compliance burdens: worst-case release modeling, 5-year accident certification, and emergency response coordination. Program 3 imposes the most stringent requirements: full Process Safety Management (PSM), Process Hazard Analysis (PHA), Management of Change (MOC), mechanical integrity, pre-startup safety reviews, and compliance audits every 3 years. Program 2 applies to intermediate processes not covered by PSM or high-risk NAICS codes.

2. How does the 'Single Process' co-location rule operate under 40 CFR § 68.3?

Under 40 CFR § 68.3, a 'process' means any activity involving a regulated substance including use, storage, manufacturing, handling, or on-site movement. Any group of vessels that are interconnected, or separate vessels that are co-located such that a regulated substance could be involved in a potential release, are considered a single process for calculating Threshold Quantities.

3. What are the requirements for Worst-Case vs Alternative Release Scenarios?

For Program 1, only a Worst-Case Release Scenario is required. For Programs 2 and 3, facilities must analyze both a Worst-Case Scenario (catastrophic total failure of the largest vessel over 10 minutes under unfavorable weather: 1.5 m/s wind and F atmospheric stability) and at least one Alternative Release Scenario that is more likely to occur (such as a pipe break, relief valve discharge, or gasket failure).

4. What is the Safer Technologies and Alternatives Analysis (STAA) requirement?

Under the EPA 2024 Safer Communities by Chemical Accident Prevention (SCCAP) final rule, certain Program 3 petroleum refining and chemical manufacturing facilities must conduct an STAA evaluation, assessing inherently safer technology (IST), passive measures, active measures, and procedural safeguards during each 5-year PHA revalidation.

5. What is the 6-month accident resubmission trigger under 40 CFR § 68.195?

If an accidental release occurs meeting the criteria of 40 CFR § 68.42 (causing on-site deaths/injuries, off-site deaths/injuries, evacuations, sheltering-in-place, or environmental damage), the facility must update and resubmit its five-year accident history and entire RMP within 6 months of the incident date.