EPA NPDES CGP & SWPPP Stormwater Auditor

Determine stormwater inspection intervals, storm runoff thresholds, and stabilization deadlines under 40 CFR 122.26.

SWPPP Inspection & Stabilization Schedule

Mandatory Inspection Interval
24-Hour Rain Trigger Status
Stabilization Completion Deadline
Sediment Cleanout Requirement:
Corrective Action Documentation Deadline:Within 24 hours of finding; Complete repairs ≤ 7 calendar days
EPA Clean Water Act Statutory Fines:Up to $64,618 per day per violation under adjusted federal civil monetary penalties
EPA 2022 CGP Rules
  • Sensitive Receiving Waters: If discharging to Tier 2/3 or impaired water, inspections are required once every 7 calendar days AND within 24h of 0.25" rain.
  • 5-Acre Threshold: Sites disturbing > 5 acres must finish stabilization within 7 days; smaller sites within 14 days.
  • Rain Gauge: Operators must maintain an on-site rain gauge or reference daily local NOAA weather station records.