40 CFR Part 262 / 42 U.S.C. § 6928

RCRA Cradle-to-Grave Hazardous Waste Generator Auditor

Audit facility hazardous waste compliance under the Resource Conservation and Recovery Act (RCRA). Determine LQG, SQG, or VSQG category status, 90-day vs 180-day on-site accumulation limits, e-Manifest tracking, and EPA civil penalty exposures.

Waste Generation Metrics ☣️

1 drum is approximately 200–220 kg. Thresholds: <100 kg (VSQG), 100–1000 kg (SQG), >=1000 kg (LQG).
P-listed wastes (cyanides, pesticides). Generating > 1.0 kg triggers automatic LQG status!
Strict limits: 90 days for LQGs; 180 days for SQGs (§ 262.16 / § 262.17).

Statutory RCRA Determination ⚖️

AUDITING GENERATOR...
Regulatory Mandate Status / Requirement
Statutory Generator Category Large Quantity Generator (LQG)
On-Site Accumulation Time Ceiling 90 Days Maximum
Current Accumulation Age 75 Days (15 Days Remaining)
EPA Identification Number (§ 262.18) MANDATORY
Biennial Hazardous Waste Report (§ 262.41) Required (Even-Numbered Years)
Potential Daily Civil Liability Exposure $0.00 / day
Compliance Mandates & Deadlines
Evaluating accumulation time limits and manifest tracking...

RCRA Hazardous Waste Statutory FAQs

What are the three RCRA hazardous waste generator categories?
Under 40 CFR § 262.13, generator categories are defined by monthly generation volumes: (1) Large Quantity Generator (LQG): Generates >= 1,000 kg (approx 2,200 lbs or ~5 drums) of non-acute hazardous waste per month, OR > 1 kg of acute hazardous waste; (2) Small Quantity Generator (SQG): Generates between 100 kg and 1,000 kg per month; (3) Very Small Quantity Generator (VSQG): Generates <= 100 kg per month.
What are the on-site accumulation time limits for LQGs vs SQGs?
Under 40 CFR § 262.16 and § 262.17: LQGs may accumulate hazardous waste in central accumulation areas for a maximum of ninety (90) days without a storage facility permit. SQGs may accumulate waste for up to one hundred eighty (180) days (or 270 days if the waste must be transported >200 miles for disposal). Exceeding these limits without an extension subjects the facility to operating an unpermitted TSDF (treatment, storage, and disposal facility).
What is the EPA Cradle-to-Grave tracking requirement?
Under RCRA, the generator remains legally responsible for its hazardous waste from the moment of creation ("cradle") through transportation, treatment, and ultimate disposal ("grave"). Generators must use the EPA Uniform Hazardous Waste Manifest (Form 8700-22 / e-Manifest) and obtain signed confirmation from the designated destination facility within 35 to 45 days, or file an Exception Report with the EPA Regional Administrator.
What are the statutory penalties for RCRA non-compliance?
Under RCRA Section 3008 (42 U.S.C. § 6928), federal civil penalties reach up to $93,000+ per day per violation (adjusted annually for inflation under the Federal Civil Penalties Inflation Adjustment Act). Criminal penalties for knowing violations of storage, transport, or manifesting mandates carry personal fines up to $250,000 and federal imprisonment up to 5 years.