Oil Storage Capacity & Facility Data
Only count containers with capacity of 55 U.S. gallons or greater (§ 112.1(d)(2)).
Tier I threshold: Cannot exceed 5,000 U.S. gallons (§ 112.3(g)(1)).
Discharge History & Engineering Criteria
Statutory SPCC Tier & Certification
TIER I QUALIFIED FACILITY - SELF-CERTIFICATION
Facility may self-certify using the EPA Tier I Qualified Facility Plan template. PE review is not required.
SPCC Rule Covered?
YES (>1,320 Gal)
Qualified Facility Tier
TIER I (≤5,000 Gal Tank)
PE Review Mandated?
NO (EXCUSED)
Plan Template Permitted
EPA TIER I TEMPLATE
SPCC Statutory Qualification Matrix
| Statutory Metric | 40 CFR Part 112 Standard | Facility Status |
|---|
EPA SPCC Rule Legal FAQ
What is the aggregate oil storage threshold for EPA SPCC rule applicability under 40 CFR Part 112?
Under 40 CFR § 112.1(d)(2), a facility is subject to the SPCC rule if it has an aggregate aboveground oil storage capacity greater than 1,320 U.S. gallons (counting only containers of 55 gallons or greater), or a completely buried storage capacity greater than 42,000 U.S. gallons, and could reasonably be expected to discharge oil into navigable waters.
What qualifies a facility as a Tier I Qualified Facility under SPCC?
Under 40 CFR § 112.3(g)(1), a facility qualifies as Tier I if: (1) it has 10,000 U.S. gallons or less in aggregate aboveground oil storage capacity; (2) it has no individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons; and (3) it has had no single discharge to navigable waters exceeding 1,000 gallons or two discharges exceeding 42 gallons in any 12-month period in the prior 3 years. Tier I facilities can complete and self-certify the EPA Tier I Qualified Facility Plan Template without a Professional Engineer (PE).
What is a Tier II Qualified Facility under SPCC?
Under 40 CFR § 112.3(g)(2), a facility qualifies as Tier II if it has 10,000 U.S. gallons or less in aggregate aboveground oil storage capacity and meets the clean spill history, but has an individual aboveground container exceeding 5,000 U.S. gallons. Tier II facilities may self-certify an SPCC plan without a PE, but cannot use the streamlined Tier I template.
When is full Professional Engineer (PE) certification required for an SPCC Plan?
Under 40 CFR § 112.3(d), a licensed Professional Engineer must review and certify the SPCC plan if: (1) aggregate aboveground storage exceeds 10,000 U.S. gallons; (2) the facility had a disqualifying discharge in the past 3 years; or (3) the facility utilizes environmental equivalence or impracticability determinations for secondary containment.