EPA Clean Water Act CGP Stormwater Auditor

NPDES Section 402 Stormwater, SWPPP & Enforcement Risk Engine

Site & Permitting Parameters

NPDES CGP triggers at 1.0+ acres or common plan of development.

Clean Water Act Compliance & Penalty Verdict

Auditing...

Auditing EPA CGP Standards...

Permit Requirement Status: MANDATORY (≥1 Acre)
NOI 14-Day Authorization Status: --
Site Inspection Protocol Status: --
Maximum Statutory Civil Penalty / Day: $64,618
Potential EPA Civil Penalty Ceiling: $0.00
Clean Water Act Section 309 Enforcement Multiplier:
CWA Civil Penalty Exposure = Violation Days × Up to $64,618 / Day / Violation
Note: Unpermitted stormwater discharge constitutes an unpermitted point source discharge under CWA Section 301!

Environmental Regulatory Deficiencies

Statutory Authority: Clean Water Act Sections 301, 402 & 2022 CGP

Under Section 301 of the Clean Water Act (33 U.S.C. § 1311), the discharge of any pollutant (including sediment, turbidity, construction chemicals, and concrete washout) into waters of the United States from a point source is unlawful unless authorized by an NPDES permit issued under Section 402.

The 14-Day Electronic Waiting Period: Submitting a Notice of Intent (NOI) does not provide instant authorization. Under the EPA CGP, operators are legally authorized to discharge stormwater only after a mandatory 14-calendar-day waiting period from the date the complete NOI appears on the EPA NeT-CGP portal, during which time the EPA or public may review the submittal.

Citizen Suit Provisions (Section 505): In addition to direct EPA and state environmental enforcement, Clean Water Act Section 505 empowers citizen environmental groups to file federal lawsuits for permit violations, seeking injunctive halts to construction and mandatory awards of attorney's fees.

Frequently Asked Questions (EPA CGP)

What constitutes 'commencing earth-disturbing activities'?
Earth-disturbing activities include clearing, grading, excavating, stockpiling fill, grubbing, or installing temporary roads. Performing any of these ground-breaking actions prior to receiving NPDES permit authorization constitutes an immediate Clean Water Act violation.
What is required for 'final stabilization' to terminate permit coverage?
To submit a Notice of Termination (NOT), the site must achieve final stabilization. Under the CGP, this requires either: (1) uniform, perennial vegetative cover with a density of at least 70% of the native background vegetative cover on all unpaved areas, or (2) permanent non-vegetative stabilization measures (e.g. riprap, gabions, concrete, geotextiles) designed to prevent erosion.
Are concrete washout discharges permitted into stormwater drains?
Absolutely not. Discharging liquid concrete washout, stucco, paint, oil, or chemical slurries into stormwater conveyance systems or directly onto the ground without an impermeable washout containment facility is strictly prohibited under CGP Part 2.3.4 and constitutes a severe, high-fine violation.
Who is legally liable on a construction site—the owner or the general contractor?
Both! Under the CGP, any entity that exercises 'operational control' over either construction plans/specifications (typically the developer/owner) or day-to-day site activities (the general contractor) is classified as an 'operator' and must obtain permit coverage. EPA frequently names both developers and contractors as co-defendants in enforcement actions.