Statutory Compliance Auditor for Clean Water Act § 402, 40 CFR § 122.26 & EPA 2022/2027 CGP: 1-Acre Disturbance Thresholds, 14-Day eNOI Windows, Weekly Site Inspections, and Civil Penalties
• Step 1: Prepare and certify comprehensive site-specific SWPPP.
• Step 2: Submit eNOI via NeT-CGP at least 14 days before groundbreaking.
• Step 3: Install perimeter sediment controls (silt fence, wattles) prior to earthwork.
• Step 4: Document inspections and corrective actions within 24 hours.