Can man-made features like dikes or roads be considered when determining discharge expectation? +
No. Under 40 CFR § 112.1(d)(1)(i), man-made features such as secondary containment berms, dikes, equipment, or structures cannot be considered when determining whether a reasonable expectation of discharge exists.
What types of oils are covered under SPCC rules? +
The definition of oil under 40 CFR § 112.2 includes petroleum, fuel oil, sludge, oil refuse, vegetable oils, animal fats, synthetic oils, hydraulic fluids, and dielectric fluids in electrical transformers.
How often must an SPCC plan be reviewed and updated? +
Under 40 CFR § 112.5(b), facilities must review their SPCC Plan at least once every 5 years, and amend it within 6 months whenever there is a change in facility design, construction, operation, or maintenance that materially affects spill potential.