Clean Water Act SPCC Plan & Oil Pollution Rule Auditor | 40 CFR Part 112
Audit EPA Spill Prevention, Control, and Countermeasure (SPCC) plan compliance under Clean Water Act 40 CFR Part 112: verify aggregate aboveground oil storage threshold (>1,320 gallons for containers >= 55 gallons), determine facility tier (Tier I self-certified template vs Tier II self-certified vs full Professional Engineer PE certification), secondary containment requirements, and EPA civil penalty liabilities up to $55,808/day under 33 U.S.C. § 1321.
Statutory Compliance Frequently Asked Questions
An SPCC plan is required if a non-transportation-related facility has: (1) a total aggregate aboveground oil storage capacity greater than 1,320 U.S. gallons (counting only containers with a capacity of 55 gallons or greater); or (2) a total completely buried oil storage capacity greater than 42,000 U.S. gallons; AND could reasonably be expected to discharge oil into navigable waters or adjoining shorelines.
A facility qualifies for self-certification if: (1) it has 10,000 gallons or less total aggregate aboveground oil storage capacity; and (2) has had no single discharge of oil to navigable waters exceeding 1,000 gallons in the past 3 years, and no two discharges exceeding 42 gallons in any 12-month period. Tier I facilities (no individual container > 5,000 gallons) can use the EPA template. Facilities exceeding 10,000 gallons require review and certification by a licensed Professional Engineer (PE).
Under Clean Water Act Section 311 (33 U.S.C. § 1321) and EPA regulations, failure to prepare, amend, or implement an SPCC plan subjects the facility owner or operator to administrative and civil penalties of up to $55,808 per day per violation (adjusted for inflation), plus potential criminal sanctions for knowing failure to report oil spills.