Clean Water Act Section 404 Wetlands Dredge & Fill Permit Auditor
Audit Clean Water Act Section 404 (33 U.S.C. § 1344) and USACE / EPA dredge and fill permitting: Waters of the United States (WOTUS) post-Sackett continuous surface connection test, Nationwide Permit (NWP) 0.5-acre thresholds, Pre-Construction Notification (PCN) 45-day review, and civil penalties up to $64,618/day.
Frequently Asked Statutory Questions
Following the Supreme Court's landmark ruling in *Sackett v. EPA* (2023), to be classified as jurisdictional 'Waters of the United States' (WOTUS) under CWA Section 404, a wetland must have a 'continuous surface connection' to a traditional navigable water, interstate water, or relatively permanent body of water (streams, rivers, lakes) such that there is no clear demarcation between waters and wetlands. Wetlands separated by dikes, berms, or dunes without a continuous surface connection are generally non-jurisdictional.
Under Army Corps of Engineers (USACE) regulations, Nationwide Permits (such as NWP 12 for utilities, NWP 14 for linear transportation, NWP 29 for residential, NWP 39 for commercial developments) typically authorize discharges of dredged or fill material causing the loss of not more than 0.5 acre (1/2 acre) of non-tidal waters of the U.S. and often require a Pre-Construction Notification (PCN) if disturbance exceeds 0.1 acre.
Under Clean Water Act Section 309 (33 U.S.C. § 1319), unauthorized discharges of dredged or fill material into jurisdictional waters carry civil penalties of up to $64,618 per day per violation (inflation-adjusted). In addition, the Corps or EPA may issue administrative restoration orders requiring full removal of fill, wetlands mitigation at ratios of 1.5:1 to 3:1, and criminal enforcement for knowing violations.
Embed This Tool
Copy the HTML snippet below to embed this calculator into your website or blog: