Clean Water Act NPDES Construction General Permit (CGP) SWPPP Auditor

Audit EPA & state Construction General Permit (CGP) thresholds, Stormwater Pollution Prevention Plan (SWPPP) requirements, NOI filing, and inspection cadences.

Permit Requirement
-
Min. NOI Advance Notice
14 Days
Sediment Basin Required?
-

Statutory Provisions & Frequently Asked Questions

What triggers the requirement for an NPDES Construction General Permit (CGP)?

Under Clean Water Act regulations (40 CFR § 122.26), stormwater discharges associated with construction activity require NPDES permit coverage if the project disturbs 1 or more acres of land, or disturbs less than 1 acre if it is part of a larger common plan of development or sale that ultimately disturbs 1 or more acres.

What is the mandatory waiting period after submitting an electronic Notice of Intent (eNOI)?

Under the EPA Construction General Permit (CGP), operators must submit their eNOI at least 14 calendar days prior to commencing any earth-disturbing activities. During this 14-day window, the EPA reviews the filing and the public may review the submittal. Authorization begins on the 15th calendar day unless the EPA notifies the operator otherwise.

What are the standard inspection frequencies under the EPA CGP?

Permittees must choose between two routine inspection schedules: (1) at least once every 7 calendar days, or (2) at least once every 14 calendar days AND within 24 hours of the occurrence of a storm event of 0.25 inches or greater. If discharging to sediment-impaired or Tier 3 waters, the inspection frequency increases to once every 7 calendar days AND within 24 hours of a 0.25"+ storm.