Clean Air Act Section 165 (42 U.S.C. § 7475) PSD Major Source Permit Auditor

Audits Prevention of Significant Deterioration (PSD) preconstruction permit triggers under 40 CFR § 52.21: 100/250 TPY major source thresholds, Significant Emission Rates (SER), Top-Down BACT, and NAAQS modeling.

⚖ Facility & Emission Inputs

📝 PSD Permitting Ledger

Major Source PSD Permit Triggered
Statutory Major Source Threshold 100 TPY (28 Listed Categories)
PSD Major Source Status Major Source (NOx ≥ 100 TPY)
Pollutants Triggering BACT NOx (120 TPY), PM2.5 (12 TPY)
Top-Down BACT Review Status 5-Step Analysis Satisfied
Air Quality Modeling (NAAQS) Compliant with Increments
Clean Air Act Permit Mandate Mandatory Preconstruction PSD Permit
Statutory Finding: The facility qualifies as a major stationary source under Clean Air Act § 165 due to NOx emissions exceeding 100 TPY. A formal PSD preconstruction permit with Top-Down BACT emission limits is legally required before groundbreaking.
Regulated Pollutant PTE (TPY) SER Threshold PSD / BACT Trigger

📚 Regulatory Mechanics: Clean Air Act Section 165 & 40 CFR § 52.21

The Prevention of Significant Deterioration Mandate: Part C of Title I of the Clean Air Act (42 U.S.C. §§ 7470 - 7479) and 40 CFR § 52.21 govern the preconstruction review of new major stationary sources and major modifications in areas designated as in attainment or unclassifiable for National Ambient Air Quality Standards (NAAQS). The statutory objective is to protect public health and prevent industrial degradation of clean airsheds.

Major Source Classification Thresholds: A stationary source is classified as "major" if its Potential to Emit (PTE)—calculated at maximum design capacity operating 8,760 hours/year unless restricted by federally enforceable permit limits—meets either:

  • 100 Tons Per Year (TPY): If the source belongs to one of 28 specified industrial categories under 40 CFR § 52.21(b)(1)(i)(a) (including chemical process plants, fossil-fuel boilers > 250 MMBtu/hr, petroleum refineries, and iron/steel mills); OR
  • 250 Tons Per Year (TPY): For any other industrial source category.

Significant Emission Rates (SER) for Modifications: For existing major sources, a physical change or change in method of operation constitutes a major modification triggering full PSD review if it results in a significant net emissions increase exceeding pollutant-specific SERs: NOx (40 tpy), SO2 (40 tpy), CO (100 tpy), VOC (40 tpy), PM10 (15 tpy), and PM2.5 (10 tpy).

The Top-Down BACT Obligation: Under 42 U.S.C. § 7475(a)(4), BACT must be applied to every pollutant emitted in major or significant quantities. The 5-step EPA Top-Down process requires identifying all available control options (including innovative technologies and low-emitting processes), eliminating technically infeasible options, ranking them by control effectiveness, evaluating economic/energy/environmental impacts, and setting the emission limit based on the most stringent remaining technology.

❓ Frequently Asked Questions (Clean Air Act PSD Permitting)

What is a "synthetic minor" permit under the Clean Air Act?
A synthetic minor permit allows a facility whose uncontrolled potential to emit exceeds major source thresholds (100 or 250 tpy) to take federally enforceable operating restrictions (such as annual fuel caps, hours of operation limits, or mandatory baghouse/scrubber operation) that cap actual emissions below the major source threshold, avoiding the time and expense of full PSD review.
What is the difference between BACT and LAER?
BACT (Best Available Control Technology) applies under the PSD program in attainment areas and considers economic costs, energy consumption, and environmental impacts. LAER (Lowest Achievable Emission Rate) applies under Nonattainment New Source Review (NNSR) in nonattainment areas and is strictly technology-forcing—economic costs cannot be considered to reject the most stringent control technology.
What are PSD Increments and how are they modeled?
A PSD increment is the maximum allowable increase in ambient concentration of a pollutant (SO2, NO2, PM10, PM2.5) above an established baseline concentration in an attainment area. Applicants must run dispersion models (AERMOD) demonstrating that the proposed facility emissions, combined with all other increment-consuming sources, will not exceed the statutory Class I or Class II increments.
Can an applicant begin site grading or construction before PSD permit issuance?
No. Under 40 CFR § 52.21(a)(2)(iii), no major stationary source or major modification may begin actual construction without a valid preconstruction PSD permit. Beginning site clearing, excavation, foundation pouring, or equipment installation prior to permit issuance violates the Clean Air Act and subjects the owner to immediate stop-work injunctions and civil penalties.
What special protections apply to Class I Federal Areas?
Class I areas (national parks over 6,000 acres and national wilderness areas over 5,000 acres) receive extraordinary statutory protection under § 165(d). The Federal Land Manager (FLM) has an affirmative duty to protect Air Quality Related Values (AQRVs), including visibility and flora. If an FLM demonstrates that emissions from a proposed source will adversely affect a Class I area, the permitting authority must deny the permit even if PSD increments are not violated.