EPA Clean Air Act RMP 40 CFR Part 68 Auditor

Threshold Quantity (TQ) Check, Program 1/2/3 Tier & Civil Penalty Engine
40 CFR Part 68 CAA Section 112(r) OSHA PSM 1910.119 Max $121,275 / Day Fine

1. Regulated Substance & Facility Process

2. RMP Program Tier & Mandates

Program 3 Facility (Highest Tier)
Threshold Quantity (TQ) under § 68.130: 10,000 lbs
Quantity vs Threshold Ratio: 150.0% of TQ (Subject to RMP)
Statutory RMP Program Level: PROGRAM 3
Process Hazard Analysis (PHA) Frequency: Every 5 Years (Mandatory)
Compliance Audit Cycle: Every 3 Years
Maximum Statutory Civil Fine: $121,275 / day
Covered under Program 3: High hazard facility. Requires full OSHA PSM integration, 5-year RMP submissions, PHA, management of change (MOC), and mechanical integrity programs.
EPA Reporting: RMP plans must be submitted electronically via the EPA Central Data Exchange (CDX) and updated at least every 5 years or within 6 months of process changes.

EPA Risk Management Program (40 CFR Part 68) FAQs

What is the EPA Clean Air Act Risk Management Program (RMP)?

Under Clean Air Act Section 112(r) and 40 CFR Part 68, facilities holding more than a threshold quantity (TQ) of any of 140 listed toxic and flammable substances must develop and implement a Risk Management Plan (RMP) to detect and prevent catastrophic chemical releases.

How does 40 CFR Part 68 classify RMP Program 1, 2, and 3?

Program 1 applies to processes where a worst-case release would not reach public receptors and has had no accidental releases in the past 5 years. Program 3 applies to processes in specific high-hazard manufacturing NAICS codes (322, 324, 325) or those subject to OSHA Process Safety Management (PSM 29 CFR 1910.119). Program 2 covers all other eligible processes.

What are the common threshold quantities (TQ) under 40 CFR § 68.130?

For listed flammable gases (such as propane, butane, methane), the threshold quantity is uniformly 10,000 lbs. For toxic substances, thresholds vary widely: e.g., chlorine (2,500 lbs), anhydrous ammonia (10,000 lbs), aqueous ammonia ≥20% (20,000 lbs), and sulfur dioxide (5,000 lbs).

What is the penalty for non-compliance with EPA RMP regulations?

Under the Clean Air Act Section 113 and federal civil penalty inflation adjustments, the EPA may assess civil penalties of up to $121,275 per day per violation against non-compliant facilities, in addition to potential criminal liability.