← Back to OmniCalc Hub
EPA Clean Air Act • 40 CFR Part 60 Subpart OOOOa

EPA NSPS Subpart OOOOa Methane LDAR Auditor

Audit upstream oil & gas fugitive emissions monitoring, 30-day initial repair attempts, 30-day resurveys, and delay-of-repair justifications.

Facility Type & Fugitive Emission Event
Mandatory initial attempt within 30 days (§ 60.5397a(h)(1)).
Must be completed within 30 days of initial attempt.
Initial Repair Attempt
-
Final Repair & Resurvey
-
LDAR Audit Status
-

40 CFR § 60.5397a Regulatory Audit Findings

    🏠 Home Hub

    Frequently Asked Questions

    What qualifies as an 'initial repair attempt'? +
    What resurvey method is required to verify a completed repair? +
    How long must LDAR monitoring records be maintained? +