Construction & Mechanics Lien Law

Iowa Mechanics' Notice and Lien Registry (MNLR) Auditor | Iowa Code Chapter 572

Audit Iowa mechanics' lien statutory compliance under Iowa Code Chapter 572: mandatory electronic posting on the Mechanics' Notice and Lien Registry (MNLR), general contractor Notice of Commencement within 10 days (§ 572.13A), subcontractor preliminary notice posting (§ 572.13B), 90-day lien posting deadline (§ 572.9), and 2-year lawsuit limitation period (§ 572.27).

Deadline: 90 calendar days from last furnishing

Statutory & Regulatory Guidance

Under Iowa Code § 572.13A, Iowa operates a centralized electronic state database called the Mechanics' Notice and Lien Registry (MNLR), administered by the Secretary of State. To preserve mechanics' lien rights on residential construction properties, general contractors must post a Notice of Commencement within ten (10) days of commencing work, and subcontractors must post a preliminary notice before the balance is paid to the general contractor.

Under Iowa Code § 572.9, a contractor or subcontractor must post a verified mechanics' lien on the MNLR within ninety (90) days from the date on which the last of the material was furnished or the last of the labor was performed. Posting after 90 days is valid against the owner only to the extent of unpaid balances and is subordinate to subsequent purchasers and lenders.

Under Iowa Code § 572.27, an action to enforce a mechanics' lien must be brought in District Court within two (2) years and ninety (90) days after the date on which the last labor was performed or materials were furnished. However, under § 572.28, upon written demand by the owner, the claimant must commence foreclosure within thirty (30) days or the lien is forfeited.