EPA NPDES / NRCS TR-55

Stormwater Wet Pond & Sediment Forebay Sizing Calculator

Calculate post-construction stormwater Water Quality Volume (WQv), permanent wet retention pool capacity, sediment forebay volume, and extended drawdown orifice sizing.

Drainage Basin & Rainfall Data
Water Quality & Pond Sizing Volumes
Water Quality Volume (WQv)
--
--
Permanent Wet Pool Volume
--
1.5 × WQv for biological nutrient uptake
Sediment Forebay Volume
--
15% of WQv (Pretreatment cleanout)
Drawdown Orifice Diameter
--
--

EPA Post-Construction Stormwater Standards:

  • Runoff coefficient: Rv = 0.05 + (0.009 × % Impervious).
  • Water Quality Volume: WQv = (P × Rv × Area) / 12 (acre-feet).
  • Orifice sizing based on standard discharge equation: Q = C_d × A × sqrt(2gH).
🏠 Home Hub