RCRA 40 CFR 262

☣️ RCRA Hazardous Waste Generator Category (VSQG, SQG, LQG) Compliance Auditor

Audit monthly hazardous waste generation, acute waste limits, on-site accumulation thresholds, and compliance tiers (VSQG, SQG, LQG) under RCRA 40 CFR Part 262.

RCRA Generator Classification
--
Accumulation Time Limit
--
Maximum Storage Cap Without RCRA Storage Permit
--

RCRA 40 CFR Part 262 Statutory Requirements

Statutory Framework & Supervisory Guidelines

This professional auditor provides compliance modeling for corporate risk managers, payroll directors, and legal counsel adhering to prevailing state and federal administrative statutes.

Frequently Asked Questions

What are the three RCRA hazardous waste generator categories?

Under 40 CFR § 262.13, generator categories are: 1) Very Small Quantity Generator (VSQG: <= 100 kg/mo non-acute, <= 1 kg/mo acute); 2) Small Quantity Generator (SQG: > 100 kg and < 1,000 kg/mo non-acute); 3) Large Quantity Generator (LQG: >= 1,000 kg/mo non-acute or > 1 kg/mo acute hazardous waste).

What are the maximum accumulation time limits for SQG and LQG?

SQGs can accumulate hazardous waste on-site for up to 180 days (or 270 days if transporting over 200 miles) without a RCRA storage permit up to 6,000 kg. LQGs can accumulate hazardous waste for no more than 90 days without a permit.