Calculate monthly hazardous and acute hazardous waste generation rates, determine regulatory generator category (VSQG, SQG, or LQG) under 40 CFR § 262.13, and audit on-site storage accumulation limits.
Statutory Guidance & FAQs
1. Very Small Quantity Generator (VSQG): Generates <= 100 kg (~220 lbs) of non-acute hazardous waste, and <= 1 kg of acute hazardous waste per calendar month. Total accumulation cannot exceed 1,000 kg.
2. Small Quantity Generator (SQG): Generates between 100 kg and 1,000 kg (~220 to 2,200 lbs) of non-acute waste per month. Accumulation limit is 6,000 kg for up to 180 days (or 270 days if transporting >200 miles).
3. Large Quantity Generator (LQG): Generates >= 1,000 kg (~2,200 lbs) of non-acute waste, or > 1 kg of acute waste per month. Accumulation limit is 90 days with no quantity cap.
Under 40 CFR § 262.16, if an SQG accumulates more than 6,000 kg of hazardous waste on-site, it automatically becomes subject to all Large Quantity Generator (LQG) regulations, including 90-day time limits, full written contingency plans, and biennial reporting.
Embed This Tool
Copy this responsive iframe code to embed this statutory auditor on your website or portal: