Audit Clean Water Act (CWA) Section 404 U.S. Army Corps of Engineers (USACE) Nationwide Permits (NWP), calculate 0.5-acre loss of waters ceilings, 0.1-acre Pre-Construction Notification (PCN) triggers, and mitigation requirements.
Statutory maximum ceiling for general NWPs is 0.50 acre (1/2 acre).
Historical 300 linear foot limit replaced by 1/10-acre PCN metric in 2021 NWPs.
Regional market price per approved wetland mitigation credit.