Clean Water Act § 404 & WOTUS Wetlands Permitting Auditor

Model US Army Corps of Engineers (USACE) Section 404 dredge and fill permitting under Clean Water Act Section 404 (33 U.S.C. § 1344) following the landmark Supreme Court decision Sackett v. EPA: analyze jurisdictional 'Waters of the United States' (WOTUS) criteria (relatively permanent waters test and continuous surface connection test for wetlands), Nationwide Permit (NWP 12, NWP 14, NWP 29) thresholds, Individual Permit alternatives analysis (Section 404(b)(1) Guidelines), and compensatory wetland mitigation bank ratios.

1. Site Hydrology & Post-Sackett Connectivity
Post-Sackett v. EPA, wetlands separated by barriers are non-jurisdictional unless an active surface breach exists.
NWP loss limits are typically 0.50 acres of non-tidal waters.
2. Section 404 Permitting & Mitigation Model
Jurisdictional Status
Awaiting Analysis
Configure site hydrology to determine USACE Section 404 permit applicability.
Regulatory Element Post-Sackett EPA / USACE Rule Audit Result
WOTUS Federal Jurisdiction Relatively Permanent + Surface Connection Pending
Applicable Permitting Pathway Non-Jurisdictional vs NWP vs Individual Pending
Pre-Construction Notification (PCN) Mandatory for >0.10 Acre Disturbance Pending
Compensatory Mitigation Ratio Typically 1.5:1 to 2:1 Wetland Credits 0.00 Credits
Supreme Court Precedent: Under Sackett v. EPA (2023), the Clean Water Act extends only to wetlands that have a continuous surface connection to a relatively permanent body of water connected to traditional interstate navigable waters, making them indistinguishable from waters of the United States.