Clean Water Act Section 404 Nationwide Permits (NWP) Auditor

Model USACE Section 404 wetland fill permits post-Sackett: continuous surface connection tests, Pre-Construction Notification (PCN) thresholds (1/10 acre), and compensatory mitigation bank fees.

Project Development & Wetland Scope

PCN required if > 0.10 acres (1/10 acre). Ceiling is 0.50 acres.
🏠 Home Hub