Back to OmniCalc Hub

Clean Water Act Section 404 & USACE Nationwide Permit (NWP) Jurisdiction Auditor (33 CFR Part 330)

Model U.S. Army Corps of Engineers (USACE) dredge and fill permitting under Clean Water Act Section 404 and 33 CFR Part 330: post-Sackett v. EPA Waters of the United States (WOTUS) jurisdiction (continuous surface connection test for wetlands), Nationwide Permit (NWP) acreage limits (e.g., NWP 12 / NWP 14 / NWP 39 / NWP 29: 0.5-acre loss ceiling), and Pre-Construction Notification (PCN) thresholds (1/10-acre loss).

Base Principal / Loss Amount
$0
Jurisdiction / Approval Type
$0
Total Tax Shield / Permitting Path
$0
Statutory Deadline / Timeline
-
Legal / Compliance Status
-

Statutory Compliance FAQ & Legal Authorities

How did the Supreme Court's Sackett v. EPA ruling alter CWA Section 404 jurisdiction?
In Sackett v. EPA (2023), the U.S. Supreme Court eliminated the former 'significant nexus' test. To be a federally jurisdictional 'Water of the United States' (WOTUS), adjacent wetlands must now have a continuous surface connection to a relatively permanent body of water connected to traditional interstate navigable waters, making it difficult to determine where the water ends and the wetland begins. Isolated wetlands are no longer federally regulated under Section 404.
What is the maximum acreage loss threshold for USACE Nationwide Permits (NWPs)?
Most development NWPs (including NWP 29 for residential developments, NWP 39 for commercial developments, and NWP 14 for linear transportation projects) establish a strict ceiling: discharge of dredged or fill material cannot cause the loss of greater than 1/2-acre (0.5 acre) of waters of the United States. Exceeding 0.5 acre automatically disqualifies the project from streamlined NWP coverage, requiring a full, complex Individual Permit.
When is a Pre-Construction Notification (PCN) mandatory under Nationwide Permits?
Under General Condition 32 and specific permit terms, a written Pre-Construction Notification (PCN) must be submitted to the USACE District Engineer prior to commencing work if the project causes the loss of greater than 1/10-acre (0.1 acre) of jurisdictional waters, or if special aquatic sites (such as vernal pools or mudflats) are impacted.

Embed This Auditor

Copy the code below to embed this tool into your website or client portal: