USACE Clean Water Act Section 404 Nationwide Permit Auditor
Calculate dredge and fill acreage in jurisdictional Waters of the United States (WOTUS), determine Nationwide Permit eligibility, and audit 0.1-acre Pre-Construction Notification (PCN) mandates under 33 CFR Part 330.
Statutory Guidance & FAQs
Under USACE Nationwide Permits (such as NWP 39 for commercial developments or NWP 14 for linear transportation projects), the discharge cannot cause the loss of greater than 1/2-acre (0.5 acre) of Waters of the United States. Furthermore, any discharge exceeding 1/10-acre (0.1 acre) mandates formal Pre-Construction Notification (PCN) to the District Engineer.
If total permanent wetland or stream loss exceeds 0.5 acres, the project is disqualified from Nationwide Permit coverage and must apply for a comprehensive, time-intensive Standard Individual Permit (IP) with mandatory NEPA environmental reviews and public notice.
Embed This Tool
Copy this responsive iframe code to embed this statutory auditor on your website or portal: