CWA § 402 Construction General Permit (CGP) Auditor

Under 33 U.S.C. § 1342 (Clean Water Act § 402) and 40 CFR Part 122, construction activities disturbing 1 or more acres (or part of a common plan of development) must obtain NPDES stormwater permit coverage, develop a SWPPP, and install sediment controls.

EPA Small Construction Waiver threshold: R < 5
Mandatory SWPPP Site Compliance Requirements
Click calculate to audit SWPPP requirements...
Engineering Controls & Waivers
Sediment Basin Storage Sizing (EPA 3,600 cu ft/acre)
43,200 cu ft
≈ 323,158 gallons
EPA R-Factor Waiver Eligibility
INELIGIBLE (Permit Mandatory)
R-factor of 18 exceeds the < 5 statutory threshold
Mandatory Stabilization Deadline
14 Calendar Days
Standard stabilization timeframe
Enforcement & Penalty Limits
  • CWA Violations: Civil penalties up to $64,618 per day per violation under EPA Federal Civil Penalties Inflation Adjustment.
  • Corrective Action Window: Discovered BMP failures must be repaired or replaced by the close of the next business day.
  • Rain Gauge Requirement: Must maintain an on-site rain gauge or reference weather station within 24 hours of 0.25"+ rainfall events.