Clean Water Act § 402 NPDES Stormwater CGP & SWPPP Auditor

Model EPA and state environmental agency Construction General Permit (CGP) compliance under Clean Water Act Section 402 (33 U.S.C. § 1342) and 40 CFR § 122.26: evaluate 1.0-acre soil disturbance threshold for NPDES stormwater permitting, mandatory Stormwater Pollution Prevention Plan (SWPPP) elements, Qualified Inspector certifications, routine site inspection frequencies (weekly vs bi-weekly + 24-hr post-0.25 inch rain), sediment basin sizing (3,600 cubic feet per acre drained), and final site stabilization standards (70% vegetative cover).

1. Construction Site & Disturbance Parameters
Statutory threshold is 1.0 acre of disturbance (or part of a common plan of development).
Impaired or Tier 3 waters mandate bi-weekly inspections and 7-day stabilization windows.
2. NPDES Regulatory Compliance Report
CGP Permit Status
Awaiting Audit
Configure site acreage and inspection parameters to analyze EPA enforcement risk.
NPDES CGP Requirement EPA 2022 CGP Standard Audit Result
NPDES Permit Applicability Mandatory for ≥ 1.0 Acre Disturbance Pending
Notice of Intent (NOI) Filing File 14 Days Prior to Earthwork Pending
Inspection Schedule Validity 7-Day or 14-Day + Rain Trigger Pending
Sediment Basin Storage Sizing 3,600 cu. ft. / Acre Drained 0 cu. ft.
Stabilization Deadline 14 Days (Standard) / 7 Days (Impaired) Pending
Federal Clean Water Act Penalties: Discharging stormwater from a construction site ≥1 acre without NPDES CGP coverage or violating SWPPP requirements carries federal civil penalties up to $64,618 per day per violation under 33 U.S.C. § 1319(d).