Environmental & EPA
US State Compliance
Clean Water Act NPDES Construction General Permit (CGP) Stormwater Auditor
Determine regulatory applicability under EPA Clean Water Act Section 402 National Pollutant Discharge Elimination System (NPDES) Construction General Permit (CGP): 1-acre soil disturbance threshold, SWPPP preparation, 7/14-day stabilization, and rain inspections.
Clean Water Act § 402 NPDES Construction Stormwater Auditor
Analyze federal EPA and delegated state environmental authority requirements under the 2022/2027 Construction General Permit (CGP) governing stormwater discharges from construction activities disturbing 1 or more acres of land.
Triggers mandatory soil stabilization.
0.25 inch threshold triggers inspection.
NPDES Permit Determination & Inspection Mandates
Enter site acreage and environmental parameters to evaluate Clean Water Act CGP compliance.