💧 Clean Water Act Section 402 NPDES Construction General Permit (CGP) Auditor
Determine Clean Water Act NPDES Construction General Permit (CGP) applicability for land disturbance (>= 1 acre), SWPPP mandates, erosion buffer standards, and storm inspection frequencies.
Statutory Permit Directives (40 CFR § 122.26)
Statutory Framework & Supervisory Guidelines
This professional auditor provides compliance modeling for corporate risk managers, payroll directors, and legal counsel adhering to prevailing state and federal administrative statutes.
Frequently Asked Questions
When is an NPDES Construction General Permit (CGP) required?
Under Clean Water Act Section 402 and 40 CFR § 122.26, a permit is required for any construction activity that disturbs 1 or more acres of land, or less than 1 acre if part of a larger common plan of development or sale.
What is the mandatory inspection frequency under the EPA CGP?
Operators must conduct routine inspections either: 1) Once every 7 calendar days; or 2) Once every 14 calendar days AND within 24 hours of the occurrence of a storm event generating 0.25 inches or greater of rainfall.