OmniCalc Hub

Clean Air Act New Source Review (NSR) & PSD Major Modification Netting Auditor

Model Clean Air Act Prevention of Significant Deterioration (PSD) & Nonattainment NSR rules under 40 CFR § 52.21: Step 1 project emissions increase test, Step 2 contemporaneous netting, and SER thresholds.

Statutory Compliance Findings

Statutory Primary Cutoff
--
Financial / Secondary Audit
--
Statutory Limitation / Scope
--
Compliance Status
Ready

Statutory Framework & Compliance Guide

This legal-grade auditing calculator analyzes critical statutory milestones, deadlines, and strict procedural requirements established by state and federal codes. Adherence to exact calendar calculation prevents catastrophic forfeiture of rights, civil penalties, or invalidation of legal instruments.

Frequently Asked Questions

What is the two-step test for a major modification under New Source Review (NSR)?

Under 40 CFR § 52.21(a)(2)(iv), a physical change or change in method of operation constitutes a major modification if: (Step 1) The project itself results in a significant emissions increase of a regulated NSR pollutant; and (Step 2) The project results in a significant net emissions increase taking into account all contemporaneous, creditable increases and decreases across the 5-year netting window.

What are the Significant Emission Rate (SER) thresholds under 40 CFR § 52.21(b)(23)?

A project emissions increase is 'significant' if it equals or exceeds designated federal rates: Carbon Monoxide (CO): 100 tpy; Nitrogen Oxides (NOx): 40 tpy; Sulfur Dioxide (SO2): 40 tpy; Volatile Organic Compounds (VOC): 40 tpy; PM2.5: 10 tpy (direct) and 40 tpy (precursors); Lead: 0.6 tpy.

What control technology applies if major NSR is triggered?

If a project triggers major NSR, it must install Best Available Control Technology (BACT) under PSD (for attainment areas) or Lowest Achievable Emission Rate (LAER) plus statutory emissions offsets under Nonattainment NSR.