Audit commercial property renovations and demolitions for Clean Air Act Asbestos NESHAP compliance. Evaluate Regulated Asbestos-Containing Material (RACM) statutory thresholds (260 linear ft / 160 sq ft / 35 cu ft) and mandatory 10-working-day advance agency notifications.
NESHAP emissions standards trigger whenever RACM to be stripped or demolished exceeds: 260 linear feet (80 meters) on pipes, OR 160 square feet (15 square meters) on other facility components, OR 35 cubic feet (1 cubic meter) off facility components.
Even if an engineer inspects a commercial building and certifies that ZERO asbestos is present, the owner/operator MUST STILL submit a formal written 10-working-day notification to the EPA or delegated state environmental agency prior to demolition!
RACM must be adequately wetted prior to and during stripping and kept wet until packaged in leak-tight wrapping. Dry removal is a direct Clean Air Act violation carrying personal criminal felony liability (up to 5 years imprisonment under 42 U.S.C. § 7413(c)).