US Construction No Damage for Delay Clause Enforceability & Exceptions Checker

Audit enforceability of contractual No Damage for Delay exculpatory clauses against state public policy prohibitions (California Pub. Cont. Code § 7102, Washington RCW 4.24.360) and recognized common law exceptions (active owner interference, bad faith, cardinal changes in NY, TX, FL).

Generated Document & Detailed Analysis
Fill in the parameters above and click the Action button to generate your document.
Statutory Law & Compliance FAQ

A 'No Damage for Delay' clause is a contract provision stating that if the project is delayed (even through the fault of the owner or architect), the contractor's SOLE remedy is an extension of time, and the contractor cannot recover monetary damages for extended jobsite overhead, idle equipment, or home office costs.

Washington (RCW 4.24.360), Oregon (ORS 279C.315), and several other states have statutes that declare no-damage-for-delay clauses completely void as contrary to public policy. In California (Pub. Cont. Code § 7102), they are void on public works for unreasonable delays.

In Zachry Construction Corp. v. Port of Houston (2014), the Texas Supreme Court ruled that a project owner cannot use a no-damage-for-delay clause to insulate itself from liability for damages caused by the owner's own intentional, willful, or bad-faith interference with the contractor's work.
Compliance Highlights
  • Multi-Jurisdiction Statutory Rule Engine
  • Real-time Audit Verification
  • Zero Server Storage / 100% Private
  • Print & Word/Text Ready Export
Key Features
  • 100% Client-Side Processing
  • Multi-State Statutory Logic
  • Instant Text & Report Export
  • Full Mobile & Desktop Support