⛏️ Construction Differing Site Conditions (DSC) Claim Modeler

FAR 52.236-2 • AIA A201 § 3.7.4 • Type I vs Type II Conditions • Geotechnical Baseline Reports (GBR)
Differing Site Conditions Doctrine: When a contractor encounters subsurface or physical conditions that differ materially from those indicated in the contract documents (Type I) or unknown physical conditions of an unusual nature (Type II), the contractor is entitled to an equitable adjustment in contract price and time. Strict compliance with prompt written notice before disturbing the condition is mandatory to prevent claim forfeiture.