AIA G702 is the summary 'Application and Certificate for Payment' signed by the contractor and notarized, detailing original contract sum, change orders, total completed and stored to date, retainage, and current payment due. AIA G703 is the detailed 'Continuation Sheet' itemizing every line item on the approved Schedule of Values (SOV).

For materials stored on-site: physical verification and secure staging are required. For materials stored off-site: the owner and lender strictly require: (1) paid invoice or bill of sale vesting title in owner, (2) certificate of insurance naming owner as loss payee, (3) bonded, segregated warehouse location, and (4) photos verifying labeling for the project.

In standard commercial practice and under many public contracting codes (e.g., Florida Stat. § 255.078, California Public Contract Code § 7201), retainage is held at 10% until the project reaches 50% completion. Once 50% completion is certified and work is progressing satisfactorily, retainage is reduced to 5% for subsequent billings.

Under AIA A201 § 9.4.2, the architect's signature certifies to the owner that, based on site observations and application data, the work has progressed to the point indicated and that, to the best of the architect's knowledge, the quality of work is in accordance with contract documents.