US Construction Contractor Differing Site Conditions (Type I & II) Notice & Claim Generator
Generate formal written Type I and Type II Differing Site Conditions (DSC) contractual notices and equitable adjustment claims under AIA Document A201 § 3.7.4, FAR 52.236-2, EJCDC, and state public works codes (California Public Contract Code § 7104, Texas, New York, Florida).
Frequently Asked Questions
A Type I Differing Site Condition occurs when the physical conditions encountered at the site differ materially from those expressly indicated or represented in the Contract Documents, plans, specifications, or geotechnical boring logs (governed by the Spearin Doctrine). A Type II condition occurs when the condition is not addressed in the contract, but is of an unusual nature that differs materially from what is ordinarily encountered in work of that character in that geographic location.
Under AIA A201 § 3.7.4, FAR 52.236-2, and virtually all state construction statutes, timely written notice before the site is disturbed is an express condition precedent. If a contractor covers up, excavates through, or alters the differing condition before the owner has an opportunity to inspect, courts frequently hold that the contractor has prejudiced the owner's defense, resulting in complete forfeiture and waiver of all delay and cost claims.
Established in United States v. Spearin (248 U.S. 132), the doctrine provides an implied warranty that if a contractor builds according to the owner's plans and specifications, the result will be adequate. If subsurface soil logs provided by the owner are inaccurate or fail to disclose bedrock or groundwater, the owner is liable for the resulting delays and extra costs.