US Construction Differing Site Conditions (Type I & II) Notice Generator
Generate formal written notice of Type I (subsurface conditions materially differing from contract documents) or Type II (unknown physical conditions of an unusual nature) Differing Site Conditions under Federal FAR 52.236-2, AIA A201, and state public works contracts.
$
Official Written Notice - Differing Site Conditions
Frequently Asked Questions
Under FAR 52.236-2 and standard construction contracts, a Type I condition occurs when the subsurface or latent physical conditions encountered at the site differ materially from those indicated or represented in the contract documents and geotechnical boring logs. A Type II condition occurs when the physical conditions encountered are unknown, unusual, and differ materially from conditions ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.
Virtually all public and commercial construction contracts (such as FAR 52.236-2, AIA A201 § 3.7.4, and California Public Contract Code § 7104) require immediate written notice before conditions are disturbed. This allows the owner and engineer to inspect the condition, verify its existence, evaluate alternatives, and mitigate costs. Failure to give timely notice can result in the forfeiture of the contractor's right to an equitable price or schedule adjustment.
The contractor must segregate costs associated with the differing condition, maintain daily force-account records (labor, equipment idle and working hours, materials), capture high-resolution date-stamped photographs, and wait for the owner or contracting officer to conduct an on-site inspection and issue written directions.