US Construction Differing Site Conditions (DSC Type I vs. Type II) Claim Analyzer

Analyze construction Differing Site Conditions (DSC Type I vs. Type II) under FAR 52.236-2, AIA A201 § 3.7.4, and California Public Contract Code § 7104. Evaluates statutory notice deadlines (14 to 21 days), proof standards, and calculates equitable adjustment claims.


Frequently Asked Questions

A Type I condition occurs when the actual subsurface or physical conditions encountered at the site differ materially from those indicated in the contract documents and geotechnical soil boring reports. A Type II condition occurs when the conditions encountered are of an unusual nature and differ materially from what is ordinarily encountered in work of that character in that region.

Both federal clauses (FAR 52.236-2) and private contracts (AIA A201 § 3.7.4) strictly require the contractor to provide written notice promptly before the conditions are disturbed. If the contractor excavates, clears, or covers up the differing site condition without giving the owner an opportunity to inspect, the contractor may be legally barred from recovering equitable adjustments due to prejudice.

A contractor can recover the direct cost of extra labor, equipment, and materials necessitated by the condition, reasonable contractor overhead and profit markups, and extended general conditions delay damages (calculated via the Eichleay formula or actual field overhead) for compensable critical path time extensions.