A GBR is a contractual document that establishes the specific baseline subsurface physical conditions (e.g., groundwater elevations, rock hardness, cobble percentages, boulder frequencies) that bidding contractors are legally entitled to rely upon when pricing subterranean construction work.
A Type I condition occurs when the actual subsurface physical conditions encountered at the site differ materially from the baseline conditions explicitly indicated or described in the contract documents, such as encountering solid bedrock where the GBR indicated medium-dense sand.
Under standard clauses (FAR 52.236-2 and AIA A201 ยง 3.7.4), the contractor must give prompt written notice to the owner/engineer before the conditions are disturbed (typically within 14 to 21 days, or prior to covering/excavating). Failure to give timely notice can bar the claim if the owner's inspection opportunity is prejudiced.
Damages include: (1) direct equipment and labor differentials (e.g., pneumatic rock breaker hours vs standard backhoe excavation), (2) hauling and off-site disposal fees for unexpected rock/boulders, (3) standby idle equipment costs during engineering evaluations, and (4) critical path project delay costs.