US Construction Contractor Change Order Markup & Overhead Profit Auditor

Audit construction change order markups and overhead & profit (O&P) against AIA A201 § 7.3.7 limits, California Public Contract Code § 7107, Texas UGC Article 11, and Florida DOT caps. Prevents cascading multi-tier markups and audits unallowable profit and bond surcharges.


Frequently Asked Questions

Under standard AIA Document A201 (General Conditions of the Contract for Construction) § 7.3.7, change orders performed under force account or cost-of-the-work terms typically limit general contractors to a maximum of 10% for overhead and 5% for profit (or a 15% combined total) on self-performed direct work, with a reduced 5% markup allowed on subcontracted tiers to prevent unreasonable compounding markups.

Generally no. In both private commercial standard contracts and public works statutes (such as California Public Contract Code and Texas UGC Article 11), a prime contractor is only permitted a nominal handling/management markup (typically 5%) on subcontractor labor and materials. Cascading multiple 15% markups down through second-tier and third-tier trade contractors is routinely disallowed during project cost audits.

No. Contractor bond (performance and payment) and commercial general liability (CGL) insurance surcharges must reflect actual out-of-pocket invoice rates (typically 1.0% to 2.5%) applied to the net cost of the change order. Contractors are prohibited from adding profit or overhead markups on top of insurance and bond premium lines.