Mining Reclamation Surety Bond Calculator
Model financial assurance obligations under the Federal Surface Mining Control and Reclamation Act (SMCRA) including backfilling, grading, topsoil replacement, and annual bond premiums.
Mine Site Parameters
Statutory Bond Amount & Cost Breakdown
Total Bond Liability
$0
With 20% regulatory contingency
Per Acre Liability
$0
Bonded liability / acre
Annual Surety Premium
$0 / yr
Paid to surety underwriter
Earthwork Backfill & Spoil Regrading:
$0
Topsoil Redistribution Volume & Hauling:
$0
Revegetation, Mulching & Lime/Fertilizer:
$0
Direct Reclamation Subtotal:
$0
Administrative Oversight & Contingency (20%):
$0
Office of Surface Mining (OSMRE) Phase Release Schedule
Phase I Release (Up to 60%)
Completion of backfilling, regrading to approximate original contour (AOC), and topsoil redistribution.
Phase II Release (Up to 85%)
Successful revegetation establishment and sedimentation control pond compliance.
Phase III Final (100%)
Expiration of the 5-year (Eastern US) or 10-year (Western arid US) responsibility period.