← Back to Hub Data Center Facilities & ASHRAE

US Data Center UPS Battery Runtime & Thermal Dissipation Calculator

Calculate full-load DC battery string discharge current, Peukert-adjusted runtime, inverter heat rejection (BTU/hr and Tons of Refrigeration), and emergency battery room airflow for mission-critical 3-phase modular UPS systems per IEEE 1184 and ASHRAE TC 9.9.

Calculation Results

Full-Load Battery Discharge Current: --
Estimated Peukert Battery Backup Runtime: --
UPS Heat Dissipation Rate: --
Cooling Load (Tons of Refrigeration): --
Emergency Ventilation Airflow (at ΔT=15°F): --
🏠 Home Hub