Segmental Retaining Wall Block, Geogrid & Drainage Gravel Calculator

Calculate concrete retaining wall block counts, gravel drainage backfill tons, perforated drain pipe length, and geogrid reinforcement layers for structural walls under NCMA standards.

Calculation & Generation Results

Total Concrete Wall Blocks Required 220 Blocks
Buried Base Course Depth 1 Full Block (6"-8" Below Grade)
#57 Clean Drainage Gravel Backfill 7.8 Tons (5.8 Cu Yds)
Geogrid Reinforcement Layers Required 2 Layers (Walls > 4 ft)

About This Tool

Calculate concrete retaining wall block counts, gravel drainage backfill tons, perforated drain pipe length, and geogrid reinforcement layers for structural walls under NCMA standards.

🏠 Home Hub

Frequently Asked Questions

Why is a buried base course mandatory for retaining walls?

Under National Concrete Masonry Association (NCMA) engineering standards, the first course of retaining wall blocks must be embedded completely underground (minimum 1 inch of embedment per foot of wall height) on a compacted gravel leveling pad to prevent sliding and base blowouts.

What does Geogrid do in a retaining wall?

Geogrid is a high-tensile polymeric mesh laid horizontally between block courses extending back into the soil. It locks the soil mass into a reinforced composite gravity structure, preventing catastrophic tipping or hydrostatic wall collapse on walls over 4 feet tall.