Calculation & Generation Results
About This Tool
Calculate concrete Segmental Retaining Wall (SRW) block counts, buried base course blocks, capstones, drainage gravel backfill (cubic yards & tons), and geogrid soil reinforcement.
Frequently Asked Questions
Why must the base course of a retaining wall be buried?
Burying the first course of blocks into compacted gravel locks the base of the wall into the earth, preventing hydrostatic lateral soil pressure from kicking the bottom of the wall outward.
Why is 12 inches of crushed stone gravel needed behind the wall?
Soil holds water, which freezes and exerts immense hydrostatic pressure. Clean 3/4-inch angular gravel allows water to drain rapidly straight down into a perforated pipe rather than pushing against the blocks.