Calculation & Generation Results
About This Tool
Calculate interlocking concrete paver square footage, 4-to-6 inch crushed stone road base (quarry process), 1-inch concrete bedding sand, and polymeric joint sand bags with ICPI standards.
Frequently Asked Questions
Why must the crushed stone base extend 6 inches beyond the paver edge?
Under Interlocking Concrete Pavement Institute (ICPI) technical specifications, extending the compacted gravel base past the edge provides structural restraint for the plastic or concrete snap edge restraint spikes, preventing perimeter pavers from shifting outward over time.
Why should you never use limestone screenings or masonry sand for the bedding layer?
Masonry sand and stone dust contain high amounts of fine silts that hold moisture, wash out during heavy rain, and cause uneven settling. ICPI requires clean, coarse, angular ASTM C-33 concrete sand for the 1-inch bedding layer.