FHWA & Caltrans / Soldier Pile Shoring
Cantilever Soldier Pile & Timber Lagging Shoring (FHWA / Caltrans) Calculator
Calculate embedment depth (D_min), required steel H-pile section modulus (S_req), timber lagging thickness, and maximum bending moment for cantilever excavation shoring walls per FHWA-RD-75-128 and Caltrans Trenching and Shoring Manual.
⛏️ Excavation Depth, Pile Spacing & Soil Properties
FHWA Shoring Design Summary
Min Embedment Depth (D)
0.0 ft
Depth below subgrade
Max Bending Moment (M_max)
0 kip-ft
Per individual H-pile
Required Section Modulus (S_x)
0.0 in³
Recommended HP-pile
Timber Lagging Thickness
3.0 in
Rough sawn Douglas Fir