🌱
Calculate commercial Low Impact Development (LID) stormwater bioretention cells and rain gardens, including Water Quality Volume (WQV), Darcy filter bed surface area, engineered soil media (ESM) depth, and ponding drain-down time.
Catchment Contributing Area (Sq Ft)
Impervious Area Coverage (%)
Design Storm Rainfall Depth (Inches)
1.0 inch (Standard EPA 85th/90th Percentile Storm)
1.5 inches (Enhanced State Water Quality Depth)
0.75 inches (Arid / Southwest Standard)
2.0 inches (High Inflow / Coastal Region)
Temporary Surface Ponding Depth dp
9 inches (Standard Commercial 6-12" range)
6 inches (Shallow / Parking Island)
12 inches (Deep Storage Basin)
Engineered Soil Media (ESM) Depth df
36 inches (3.0 ft - Full pollutant removal)
30 inches (2.5 ft - Minimum standard)
48 inches (4.0 ft - Deep root shrubs/trees)
Soil Media Hydraulic Conductivity k
2.0 in/hr (Standard 85% Sand / 15% Fines mix)
4.0 in/hr (High permeability sandy loam)
1.0 in/hr (Clogged / aging design safety factor)
Max Surface Drain-Down Time (Hours)
24 Hours (Mosquito Vector Prevention Standard)
48 Hours (Maximum allowable EPA threshold)
12 Hours (Fast turnover)
Native Infiltration Rate (in/hr)
Below 0.5 in/hr mandates underdrain
Organic Mulch Layer Thickness
3 inches Shredded Hardwood Mulch
2 inches Mulch
Calculate Bioretention Filter Area & Storage